How much water will this data center use?

Pick a county, enter the size, and get an estimate of the facility's water draw next to the local supply. You can also check a developer's water claim. It's free, open source, and every assumption is shown with its source.

The project

Use whatever the developer or news coverage says. Leave anything you don't know as “not disclosed”.

Announcements usually give total power (“a 300 MW campus”). Pick IT load only if that's what was stated.

Cooling
Advanced assumptions
65%

Campuses rarely run at their full announced power. Federal and state studies assume 50–67% on average.

4

How many times tower water is reused before it's flushed (blowdown). Higher means less water drawn.

Choose a county or city to see the estimate.